SHARE

INP awarded as
„Attraktiver Arbeitgeber
Rheinland-Pfalz“ 2021

Learn more...

  • Lift your carreer to a new level!

    Our high demand on quality starts with recruiting the best employees and results in customer satisfaction way above average.

    Frederik Weyer – Recruiting
  • Offshore Plattform Öl&Gas
  • Bild von einer Wimpelkette

EXPERIENCE THE ADVENTURE OF SOUTH AFRICA FOR REAL

Experiencing the Big Five, taking the cable car up to Table Mountain or embarking on a safari tour in the Pilanesberg Game Reserve – these are all things that we associate with the adventure of South Africa. The exciting large-scale projects that we look after at INP South Africa are just as exciting and challenging. Eskom, the leading power station operator in southern Africa, is building the largest power plants on the continent. Eskom is building coal-fired power plants at the Medupi and Kusile sites, each with 6 x 800 MW capacity.

With a multicultural and multicolored team drawn from about 10 nations, INP South Africa is working in the areas of installation supervision and quality assurance at both power plants. Every day, we make an active contribution to the progress of the building work. At the same time, it is particularly important for us and a natural feature to work in harmony with the local culture and conditions. We provide particularly extensive and intensive support for our employees in South Africa.

ANY OTHER QUESTIONS?

Alta Stols Geschäftsführerin

Alta Stols

CEO

INP Engineering and Services (Pty) Ltd.

INP South Africa (Pty) Ltd.

Loftus Park Building B Wing 1 Suite 3

416 Kirkness Street

Arcadia

0083 Pretoria

South Africa

Tel. +27 82 444 9439

alta.stolsnoSpam@noSpaminp-e.com

More information