SHARE
  • Strong amongst German SMEs

    We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.

    Georg Jester – General Manager
  • Green Energy Geothermie
  • Focus on our customers

    Professionalism and reliability are what our customers appreciate. And this has been so for over 30 years.

    Andreas Haaß – Managing Director
  • HGÜ HVDC Offshore Sylwin
References   /  Atlas Cove Jetty – Tanker Ship Unloading Station

Atlas Cove Jetty – Tanker Ship Unloading Station

Location: Nigeria

System/Technology: Siemens S7, Siemens S5F, Win CC

Services: Commissioning, Training

Industry Branch/Type of Plant: Large Plants

Client: Siemens

Project Size: EUR 500,000

Tasks

To increase the loading and unloading capacities of oil tankers, a new tanker ship unloading station was constructed. A Simatic S7 controller from Siemens was used to automate the flow quantity.

INP services

  • Engineering of controls and regulation
  • Visualization in WinCC
  • Controls enclosure manufacture
  • Integration of fire and gas warning systems with the S7 controller
  • FAT at customer’s test facility
  • Commissioning
  • Customer training on site
  • Global Mobility: Management of international fiscal and registrative requirements

Points of contact

Andreas Haaß Geschäftsführer

Andreas Haaß

General Manager

INP Deutschland GmbH

Werkstraße 5

67354 Römerberg

Germany

Tel. +49 6232 6869-0

andreas.haassnoSpam@noSpaminp-e.com

More references

Now, you can discover even more exciting projects and references from the world of INP International Projects.

Competence: Control systems