References   /  Feasibility study for battery energy storage system (BESS)

Feasibility study for battery energy storage system (BESS)

Location: Ingelheim am Rhein, Germany

Services: Solution development / Feasibility studies

Industry Branch/Type of Plant: Green Energy

Client: Boehringer Ingelheim Pharma GmbH & Co. KG

Activity period: 2025

Tasks

Boehringer Ingelheim Pharma GmbH & Co. KG plans to install a battery energy storage system (BESS) to optimize their on-site consumption based on two ground-mounted PV systems. Additionally, with this study is examined the potential for the BESS to support the emergency power supply functions and contribution of a black-start capability.

INP gets the contract for a detailed feasibility study focused on technical and economic aspects, the development of a practicable system concept, and a preliminary system design including an initial economic evaluation.

Project description

INP engineered a scenario-based assessment model for the battery energy storage system. In addition to the preliminary technical design, a scalable business case was calculated. Key aspects included internal parameters, e.g. minimum return on capital, availability of space and grid connection capacity, as well as potential additional values like peak-load capping and under-/over- voltage support. The results served a basis for decision of further steps up to project implementation.

INP Services

  • Analysis and prioritization of core- , additional- , and opportunity applications for the battery energy storage system
  • Assessment of regulatory and technical framework conditions
  • Evaluation and technical design of available battery storage technologies
  • Enquiry of indicative price offers
  • Development of an energy-flow simulation model and profit calculation
  • Economic analyses based on several scenarios
  • Estimate of investment costs, including grid connection and peripheral infrastructure
  • Evaluation of non-monetary value factors (system security, supply continuity)
  • Implementation schedule
  • Moderating of project- and final result-workshops

Points of contact

Michael Ohmer Leiter Energie- und WärmeVersorgung

Michael Ohmer

Head of Energy and Heat Supply

INP Deutschland GmbH

Werkstraße 5

67354 Römerberg

Germany

Tel. +49 6232 6869-0

michael.ohmernoSpam@noSpaminp-e.com

More references