Michael Ohmer
Head of Energy and Heat Supply
INP Deutschland GmbH
Werkstraße 5
67354 Römerberg
Germany
Tel. +49 6232 6869-0
michael.ohmer
@
inp-e.comvCard
INP International Projects: We offer you more than 35 years of experience in global power plant, large-scale installation construction and the power industry, combined with the reliability of an owner-managed company.
INP offers you an interesting professional future with bright prospects. Now you can become part of our international team.
INP is your reliable partner in the fields of power generation, transmission and distribution, as well as green energy and construction and infrastructure.

We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.![]()


Professionalism and reliability are what our customers appreciate. And this has been so for over 30 years.![]()

Location: Feuchtwangen, Germany
System/Technology: electrolyser, compressor, low-/medium-pressure storage, hydrogen distribution station, trailer filling station
Services: Project management, As-built status and data recording, Pre-project planning and tendering, Basic-engineering and pre-engineering, Solution development / Feasibility studies
Industry Branch/Type of Plant: Green Energy
Client: H2 Hub nahKRAFT GmbH
Activity period: 02/2025 - 12/2025
H2 Hub nahKRAFT GmbH is planning the construction of a 5 MW electrolysis plant for the production of green hydrogen. The plant is designed to convert electricity from renewable energy sources into hydrogen for cross-sector applications, store it, and supply it on demand – primarily for the mobility sector. In a second construction phase, the plant will be expanded to 15–20 MW.
INP Deutschland GmbH was ordered as Owner’s Engineer for the technical planning services, covering preliminary design, basic design, and permitting design. A digital twin was used to develop and simulate the total energy concept and for sizing the main components especially storage systems. In addition to the electrolysers, the plant comprises all required auxiliary systems, including cooling systems, water treatment, compression, storage, filling systems, electrical supply, and control systems.
In preliminary and basic design phases, the main and auxiliary systems as well as the associated buildings were planned in detail. For the permitting phase, the required documentation was prepared and submitted as part of the building permit application. A key aspect of the project is the energy concept. Regulatory requirements related to the power supply were assessed and incorporated into the design. Corresponding scenarios were developed and the necessary simulations were carried out. The goal is to prepare a complete engineering design package for a 5 MW plant, which will be approved as part of the building permit application. The plant is designed for a subsequent expansion to 20 MW, subject to approval under the German Federal Immission Control Act (BImSchG).
Folgende Leistungen wurden von INP übernommen:
To optimize your visit on our website we use cookies. Some of them are necessary whereas others are helping us to improve and customize the user experience of our website. For this purpose, cookies are used to collect and analyze pseudonymized data of website visitors. You can at any time change or withdraw your consent from the use of cookies.
Further information regarding cookies in this website can be found in our privacy policy