vCard
INP International Projects: We offer you more than 35 years of experience in global power plant, large-scale installation construction and the power industry, combined with the reliability of an owner-managed company.
INP offers you an interesting professional future with bright prospects. Now you can become part of our international team.
INP is your reliable partner in the fields of power generation, transmission and distribution, as well as green energy and construction and infrastructure.

We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.![]()


Professionalism and reliability are what our customers appreciate. And this has been so for over 30 years.![]()

Location: Mainz, Deutschland
System/Technology: Large-Scale Heat Pump
Services: Production monitoring, Commissioning, Project management, Quality assurance, Site management, Documentation, Pre-project planning and tendering, Basic-engineering and pre-engineering, Detail engineering, Installation supervision, Solution development / Feasibility studies
Industry Branch/Type of Plant: Green Energy
Client: Kraftwerke Mainz-Wiesbaden AG
Activity period: 2025 to 2027 (expected)
A data center consisting of three building modules is currently being constructed on site of Kraftwerke Mainz-Wiesbaden AG (KMW) in Mainz. Common goal with this
project is to feed the waste heat generated during data center operation into the Mainz district heating network via a central large-scale heat pump system.
The large-scale heat pump plant will be implemented stepwise. In the first expansion phase, the waste heat from the first data center module will be utilized. In a second expansion phase, the additional modules will be integrated. Each data-center module can provide up to 15.6 MW of waste heat at a temperature level of approximately 28°C, enabling more than 30 MWth of thermal output to be generated via large-scale heat pumps and supplied to the district heating network.
INP get contract for general planning engineering and services, covering all service phases in accordance with the German HOAI framework — from conceptual design and detailed engineering to permitting and execution planning, implementation and construction supervision. The project represents a key milestone in the decarbonization of the heat supply in Mainz.
As general planner, INP is responsible for the holistic design of the large-scale heat pump system at the KMW site. This includes technical building and plant engineering design, as well as all interfaces to the power supply, heating storage systems, and data center infrastructure.
Key challenges are integrating of a existing building under monument protection into the planning of a new machinery building as well as precise coordination with the district heating network operator. A central goal is to ensure an average COP of at least 2.6 in order to secure funding eligibility.
INP provided the following services:
To optimize your visit on our website we use cookies. Some of them are necessary whereas others are helping us to improve and customize the user experience of our website. For this purpose, cookies are used to collect and analyze pseudonymized data of website visitors. You can at any time change or withdraw your consent from the use of cookies.