References   /  Pfleiderer - Migration of Boiler Control - CHPP

Pfleiderer - Migration of Boiler Control - CHPP

Location: Neumarkt in the Upper Palatinate, Germany

System/Technology: Siemens S7-1500

Services: Commissioning, Project management, As-built status and data recording, Basic-engineering and pre-engineering, Detail engineering

Industry Branch/Type of Plant: Power plants, Power Generation

Client: Pfleiderer Holzwerkstoffe GmbH

Tasks

  • Conversion of S5 control system to S7-1500 configured in TIA Portal
  • Recommissioning in the 7-day downtime of the summer revision

Project description

  • Conversion and integration of the boiler control system of a biomass power plant consisting of four S5-135U units into an S7-1500 CPU
  • Connection to the existing system topology for communication with other S5 controllers, S7-300 controllers, decentralized ET200M I/O and Profibus drives

INP Services

  • Hardware planning and delivery of the required control components
  • Basic and detail engineering software
  • Delivery of a new redundant WinCC server pair
  • Configure existing WinCC images to 16:9 format
  • Assembly of the supplied components
  • System commissioning

Points of contact

Michael Kopp Leiter Projektmanagement

Michael Kopp

Head of Project Management

INP Deutschland GmbH

Werkstraße 5

67354 Römerberg

Germany

Tel. +49 6232 6869-0

michael.koppnoSpam@noSpaminp-e.com

More references

Now, you can discover even more exciting projects and references from the world of INP International Projects.

Competence: Control systems