Michael Kopp
Head of Project Management
INP Deutschland GmbH
Werkstraße 5
67354 Römerberg
Germany
Tel. +49 6232 6869-0
michael.kopp@inp-e.comvCard
INP International Projects: We offer you
35 years of experience in global power plant, large-scale installation construction and the power industry, combined with the reliability of an owner-managed company.
INP offers you an interesting professional future with bright prospects. Now you can become part of our international team.
INP is your reliable partner in the fields of power generation, transmission and distribution, as well as green energy and construction and infrastructure.
We stand for the values of owner-managed SMEs: reliability, responsibility, quality and adherence to deadlines.
Georg Jester – General ManagerProfessionalism and reliability are what our customers appreciate. And this has been so for over 30 years.
Andreas Haaß – Managing DirectorLocation: Wolfsburg, Germany
System/Technology: Simatic S7 / WinCC
Services: Commissioning, Project management, Documentation, As-built status and data recording, Basic-engineering and pre-engineering, Detail engineering
Industry Branch/Type of Plant: Green Energy, Power Generation, Power plants
Client: GE Jenbacher (now: Innio Jenbacher)
Programming of a higher level control system and control for a sewage sludge drying plant. In addition, INP was assigned with the task of integrating a new combined heat and
power unit by GE Jenbacher into the monitoring and control systems.
The combined heat and power unit and heating water boiler system serve to utilize the biogas produced in the biogas plant. The biogas can either be converted into electrical and thermal energy in the two combined heat and power unit modules, or high-thermal energy is generated with thermal oil as heat transfer medium with the help of a thermal oil boiler. The generated electric energy is fed into the network of the energy supply companies. The generated thermal energy is used for sewage sludge drying and district heating supply at the site.
The higher-level control system to be programmed by INP controls the return temperatures of the individual heating circuits, taking into account the gas storage level and, if required, it exchanges the heat energy in the heating circuits. The individual heat generators are also turned on or off depending on the load.
To optimize your visit on our website we use cookies. Some of them are necessary whereas others are helping us to improve and customize the user experience of our website. For this purpose, cookies are used to collect and analyze pseudonymized data of website visitors. You can at any time change or withdraw your consent from the use of cookies.